Transmission
Transmission System from Generation to Various Off takers / Grid
SUGEN to Ahmedabad Distribution Area | 400 kV transmission system with length of 249 km implemented through Torrent Power Grid Limited, a Joint venture with PGCIL in which Torrent has 74% stake. |
SUGEN to Surat Distribution Area and to GETCO | Torrent Power Limited has laid
|
DGEN to PGCIL’s Navsari sub-station | 400 kV Double Circuit line, developed by Torrent Power Limited in lieu of PGCIL. |
Other transmission networks | 220/132 kV transmission system in Ahmedabad distribution area |
Transmission License from the Hon’ble Central Electricity Regulatory Commission for DGEN Navsari line and Sugen – Pirana Line