Business Areas

Generation

786.5 MW Renewable plants

Capacity

49.6 MW Wind Power Plant

Commissioning

March, 2012

Location

Spread across three talukas - Lalpur, Jamjodhpur and Bhanvad at a distance of 40 km from Jamnagar in the state of Gujarat.

Technology

62 Nos. 800 kW gearless wind turbines with synchronous generator

Accolades

Registered under CDM with UNFCCC.

 

Capacity

51 MW Solar Power Plant

Commissioning

March, 2015

Location

At Charanka Solar Park, Patan district in the state of Gujarat

Technology

Polycrystalline technology with fixed tilt

 

Capacity

87 MW GENSU Solar Power Plant

Commissioning

March, 2016

Location

Adjacent to 1147.5 MW SUGEN Mega Power Plant, near Surat in South Gujarat

Technology

Polycrystalline technology with fixed tilt

Accolades

Project completion in a short time of 17 weeks

High quality equipment with lesser auxiliary

consumption and more redundancy

Unique Landscaping and aesthetics

Specially abled staff hired for some of the O&M activities

 

Capacity

201.6 MW Wind Power Plant at Kutch

Commissioning

March, 2016

Location

Spread across three talukas – Abdasa, Lakhpat, Nakhatrana at a distance of 45 km from Bhuj in the state of Gujarat.

Technology

Consists of 40 nos of S97_90HH 2100 kW and 56 nos of S97_120HH 2100 kW Wind Turbines with Double Fed induction Generator

 

Capacity

50.9 MW Wind Power Plant at Rajkot, Gujarat

Commissioning

32.0 MW - January, 2018 ;
18.9 MW - March 2019

Location

Spread across Three Talukas – Jasdan, Chotila and Vinchhiya. Site located at a distance of 71 Km from Rajkot in state of Gujarat

Technology

Consists of 40 Nos. 800 kW gearless wind turbines with synchronous generator and 9 Nos of S97_120 HH 2100 kW Wind Turbines with Doubly fed induction generator

 

Capacity

50.4 MW Wind Power Plant at Bhavnagar, Gujarat

Commissioning

March, 2019

Location

Spread across Mahuva taluka at distance of 93 Km from Bhavnagar in state of Gujarat.

Technology

Consists of 13 Nos S97_120 HH 2100 kW Wind Turbines with Doubly fed induction generator

 

Capacity

60 MW Wind Power Plant at Gudadanal, Karnataka

Commissioning

March, 2018

Location

Spread across Lingasugur taluka in the state of Karnataka, at a distance of 93 Km from Raichur.

Technology

Consists of 30 Nos G114-106 HH 2000 kW + Max Power Wind Turbines with Doubly fed induction generator.

 

Capacity

60 MW Wind Power Plant at Zalki, Karnataka

Commissioning

March, 2018

Location

Spread across Aland and Afzalpur taluka Karnataka, at a distance of 45 Km from Kalaburagi.

Technology

Consists of 30 Nos G114-106 HH 2000 kW + Max Power Wind Turbines with Doubly fed induction generator

 

Capacity

126 MW Wind Power Plant at Lohara-Koral, Maharashtra

Commissioning

December, 2019

Location

Spread across Lohara, Tuljapur and Osmanabad in the state of Maharashtra, at a distance of 93 Km from Raichur.

Technology

Consists of 63 Nos G114-106 HH 2000 kW + Max Power Wind Turbines with Doubly fed induction generator.

 

Capacity

50 MW Wind Power Plant at Kutch, Gujarat

Commissioning

July, 2019

Location

Spread across Village Dayapar, Nani Virani, Ghadani & others in Kutch district in the state of Gujarat.

Technology

Consists of 25 nos. of DF/2000/113 WTGs, having rated capacity of 2000 kW

 

786.5 MW Renewable plants

image
  • Wind - 649 MW
    Solar - 138 MW
  • Jamnagar, Charanka, Near Surat, Kutch, Rajkot, Bhavnagar in Gujarat
  • Gulbarga & Raichur in Karnataka
  • Osmanabad in Maharashtra