Torrent Power Grid Limited has filed the Petition before the Central Electricity Regulatory Commission for Truing up of Capital Cost for the period from 1st April 2019 to 31st March 2024 and determination of transmission tariff for the period from 01-April 2024 to 31st March 2029 for Transmission system constructed, maintained and operated by Torrent Power Grid Ltd vide License No.2/Transmission/CERC.
Torrent Power Grid Limited has filed a petition before the Central Electricity Regulatory Commission (CERC), New Delhi under Section 62 and 79(1) (C) & (d) of the Electricity Act, 2003 and CERC (Terms and Condition of Tariff) Regulations, 2024 read with Regulation 15(1)(a) and 23 of CERC (Conduct of Business) Regulations, 2023 seeking determination of tariff for the period from commercial operation date till 31.03.2029 for the Transmission Project developed under ‘Transmission scheme for evacuation of 4.5 GW RE injection at Khavda PS under Phase II - Part D’.