;
Result of Torrent Power Limited-Distribution’s RfS No:TPL/Solar/03/2020 dated 23.12.20 for procurement of power through competitive bidding process followed by e-reverse auction from grid connected solar photovoltaic power projects to be set up in Gujarat
|
Ranking |
Tariff (Rs./unit) |
|---|---|
|
L1 (Adani Renewable Energy Holding Fifteen Ltd) |
2.22 |
|
L1 (Torrent Power Limited) |
2.22 |
|
L2 |
2.23 |
|
L3 |
2.26 |