Torrent Power Grid Limited has filed the Petition before the Central Electricity Regulatory Commission for Truing up of Capital Cost for the period from 1st April 2019 to 31st March 2024 and determination of transmission tariff for the period from 01-April 2024 to 31st March 2029 for Transmission system constructed, maintained and operated by Torrent Power Grid Ltd vide License No.2/Transmission/CERC.