tariffPetition

tariffPetition

Petitions

Tariff application before Hon’ble CERC for determination of Generation Tariff of 1147.5 MW Sugen Mega Power Plant covering the period 01st April 2024 to 31st March 2029.
Tariff application before Hon’ble CERC for determination of Generation Tariff of 382.5 MW UnoSugen Power Plant covering the period 01st April 2024 to 31st March 2029.
Tariff application before Hon’ble CERC for determination of Generation Tariff of 1200 MW Dgen Mega Power Plant covering the period 01st April 2024 to 31st March 2029.
Torrent Power Grid Limited has filed the Petition before the Central Electricity Regulatory Commission for Truing up of Capital Cost for the period from 1st April 2019 to 31st March 2024 and determination of transmission tariff for the period from 01-April 2024 to 31st March 2029 for Transmission system constructed, maintained and operated by Torrent Power Grid Ltd vide License No.2/Transmission/CERC.