22 km spur line connecting the plant with GSPL’s (Gujarat State Petronet Limited) Mora-Ankleshwar gas pipeline at Bhadol village has been constructed.

Arrangements for long term supply of 53 Trillion BTU of Natural gas per annum on a Net Heating Value basis ( i.e. 4.7 MMSCMD) are being made.

Security of fuel supply will ensure reliability of power and nearness to point of gas terminals will not only reduce other risks but also be of economic advantage.

  SUGEN 1147.5 MW CCPP
The SUGEN 1147.5 MW CCPP is a backward integration more...