     Chronological development of The Surat Electricity Company Limited

Government of Bombay granted License on 10 th April 1918 for a period of 50 years to European businessmen at Bombay. A partnership firm was opened between The KILLICK NIXON & COMPANY and CALLENDER’S CABLE CONSTRUCTION COMPANY LIMITED, LONDAN under Section 9(2) of the INDIAN ELECTRICITY ACT, 1910. for carrying out business of generation and distribution of electrical energy in franchised area of 52 sq. kms. in the city of Surat.

:: 1920 ::

THE SURAT ELECTRICITY COMPANY LIMITED was incorporated and registered at Bombay on 22 nd June 1920.

Promoters / Directors
1) H .P. Hebblethwaite
2) Purshotamdas Thakordas
3) Ramdas Narandas
4) E.W. Wilson
5) W.G.Hendrey
6) F.A.H.East
7) R. C. Giles

 
:: 1921 ::
Land Purchased on February 02, 1921 from Khanshaheb Esufally Ebrahimji vide Document No. 321 for Powerhouse. The land popularly known as “Dad A Elahi” originally belonged to Nawab Mir Muzfarkhan.

Collector sanctioned Land on lease for erection of sub-stations and electrical distribution at:
1) Chowk Bazar
2) Kelapith
3) Zampa Baza
 
:: 1922 ::

The Company established a Diesel Generating Plant with the installed capacity of 282 kW and gave the first electric connection to in May’ 1922.

Surat City was illuminated by Electric Streetlights as per agreement with Municipality.

Probably, Surat was the first city of Gujarat to be illuminated by street lights.

First 10 Consumers were:
1) Chief Officer, Surat Municipal Corporation
2) Lalitmohan C. Gandhi
3) Khanbahadur Shaikhali Bagjasaheb
4) Ravbahadur Ranjit Vakil
5) Maganlal M. Joshina (1st Motive power Consumer)
6) Rangildas G Mehta
7) Ranjit Lakhapati
8) Ishavarlal C.Munsaf
9) Abdulally Hyderally Malbari
10) Abdulhusainbhai Saheb

 
:: 1925 ::
Collector sanctioned following lands on lease for erection of sub-stations and electrical distribution at:

1) Jadakhadi Mahidharpura.
2) Sagarampura.
 
:: 1926 ::
Collector sanctioned land on lease for erection of sub-station and electrical distribution at Nanpura.
 
:: 1932 ::
Collector sanctioned lands on lease for erection of sub-stations and electrical distribution at:

1) Sayedpura, Market.
2) Gopipura.
 
:: 1933 ::
Land adjoining Power House purchased on August 29, 1933 from Khansaseb Esufali Ebrahimji vide Document No. 2179. The land was part of property of Dad. A. Elahi, originally belonging to Nawab Mir Muzfarkhan.
 
:: 1934 ::

Purchased land at Golsheri, Galemandi to erect sub- station on October 12, 1934 vide Document No.2836.

 
:: 1935 ::

Collector sanctioned lands on lease for erection of sub-station and electrical distribution at:

1) Danapith Begampura.
2) At College – Athwa Lines (Land on rent).

 
:: 1936 ::

Land acquired by acquisition award from Collector for Salabatpura Momnavad.

 
:: 1937 ::

Obtained land acquisition award from Collector for lands at:

1) Inderpura Khatrivad.
2) Navapura Golvad.
3) Darukhana Begampura.

Purchased lands for erecting sub-stations and for electrical distribution at Salabatpura Machhiwad on October 17, 1937 vide Document No.2734.

 
:: 1938 ::

Land adjoining Power House towards Station Road was purchased on 29 th July 1938 by Company’s Mr. Mangaldas N. Mehta from Mr. Maneklal Bhukhandas vide Documents No. 1859.

The land was part of property known as Dad .A. Elahi, originally belonging to Nawab Mir Muzjafarkhan. Document was registered in name of THE SURAT ELECTRICITY COMPANY LIMITED on November 22, 1938 vide Document No.5558.

Collector sanctioned land on lease to erect sub-station for electrical distribution at Ranitalao.

 
:: 1939 ::

Collector sanctioned lands on lease to erect sub-stations for electrical distribution at:

1) Laldarwaja
2) Sayedpura Naghoriwad
3) Amliran

Lands purchased for erection of sub-station on August 31, 1939 vide Document Nos. 2234 & 2236 for following :

1) Zunda Sheri, Sagrampura.
2) Navagam, Varachha road.

 
:: 1940 ::

Collector sanctioned land on lease to erect sub-stations for electrical distribution at:

1) Nanpura Machiwad.
2) Tulsi Falia, Begampura.

 
:: 1941 ::

Obtained land on rent to erect sub-station at:

1) Umarwada (Bela mill).
2) Nawab’s palace (Begampura).

 
:: 1945 ::

Collector sanctioned land on lease for erection of sub-station & electrical distribution at:

1) Athwagam (Athwalines)

 
:: 1946 ::

Obtained land on rent for erection of sub-station at Katargam Bumbawadi.

 
:: 1947 ::
Chairman of the Company :
Consumers Base 14919.
Units sold (In Lacs) 10.52 units.
Maximum Demand 2940 kW.
Profit (In Lacs) Rs. 3.01
 
:: 1948 ::
Chairman Mr. V.F. Noel
Consumers 539 consumers added making total 15458
Units sold (In Lacs) 11.32 units
Maximum Demand 3000kW
Profit (In Lacs) Rs. 1.84 lacs
 
:: 1949 ::
Chairman  
Consumers 969 consumers added making . Total 16427
Units sold (In Lacs) 11.09 units
Maximum Demand 3250 kW
Profit (In Lacs) Rs. 1.91 lacs
 
:: 1950 ::
Chairman Mr.K.G.Milne
Consumers 1366 consumers added. Total 17793
Units sold (In Lacs) 2.9 units
Maximum Demand 3400 kW
Profit (In Lacs) Rs.3.17 lacs
 
:: 1951 ::
Chairman Mr.K.G.Milne
Consumers 1541 added making total of 19334
Units sold (In Lacs) 14.81 lac units
Maximum Demand 4000kW
Profit (In Lacs) Rs.3.63 lacs
Collector sanctioned land on lease for erecting sub –station for electrical distribution at Sattar Kotdi (Salabatpura).

Obtained land on rent to erect sub-station at Begampura Koliwad from SMC.
 
:: 1952 ::
Chairman Mr.K.G.Milne
Consumers 959 added - Total of 20293.
Units sold (In Lacs) 16.65 lac units
Maximum Demand 4850 kW
Profit (In Lacs) Rs.5.57 lacs
Planned to connect State grid supply with company.

Purchased land on July 25, 1952 at Rampuras & erected sub-station for Electrical distribution vide Document No. 1211.
 
:: 1953 ::
Chairman Mr.K.G.Milne
Consumers 1303 added - Total 21596
Units sold (In Lacs) The company sold 23.61 units
Maximum Demand 6880 kW
Profit (In Lacs) Rs.4.99 lacs
No. of Receiving station 1
22 kV ‘A’ Receiving station was commissioned and connected to state grid.

Obtained land by acquisition at Motichipwad on award from Collector.

Purchased lands on March 07, 1953 to erect substation at Bunelawad vide Document No. 351.

Obtained land on lease rent at Standard Silk Mills.
 
:: 1954 ::
Chairman Mr.K.G.Milne
Consumers 1235 added - Total 22831
Units sold (In Lacs) 28.25 units
Maximum Demand 7600 kW
Profit (In Lacs) Rs. 7.13 lacs
Nos. of Receiving station 1
Purchased land on July 26, 1954 to erect sub-station at Muglisara vide Document No. 1277.
 
:: 1955 ::
Chairman Mr.K.G.Milne
Consumers 1541 added - Total 24372
Units sold (In Lacs) 33.87 lac units
Maximum Demand 9000 kW
Profit (In Lacs) Rs.8.69 lacs
Nos. of Receiving station 1
Purchased lands on March 05, 1955 to erect sub-station at Rustompura vide Document No.287.

Obtained land on rent from SMC to erect sub-station at Hope Circle (Laldarwaja).
 
:: 1956 - 57 ::
Chairman Mr.K.G.Milne
Consumers 1279 added - Total 25651
Units sold (In Lacs) 50.48 lac units
Maximum Demand 10700 kW
Profit (In Lacs) Rs.6.53 lacs
Nos. of Receiving station 1
Land for second Receiving Station (“B”) was purchased on February 11, 1957 vide Document No. 319.

Purchased land on July 06, 1956 to erect sub-station at Rughanathpura vide Document No. 1594.
 
:: 1958 ::
Chairman Mr.K.G.Milne
Consumers 1057added - Total 267118
Units sold (In Lacs) 45.41 lac units
Maximum Demand 11350 kW
Profit (In Lacs) Rs.6.00 lacs
Nos. of Receiving station 1
Obtained Land on lease to erect sub-station at Khatodara.
 
:: 1959 ::
Chairman Mr. P.B.C.R.Clark
Consumers Added 1266 - Total 27984
Units sold (In Lacs) 47.29 lac units
Maximum Demand 12200 kW
Profit (In Lacs) Rs.5.26 lacs
Nos. of Receiving station 1
Purchased lands on May 30, 1958 to erect sub-station at Vartia dehri (Katargam) vide Document No. 896.
 
:: 1960 ::
Chairman Mr. A.N. Haksar
Consumers 1343added - Total 29327
Units sold (In Lacs) 52.82 lac units
Maximum Demand 13200 kW
Profit (In Lacs) Rs. 5.64 lacs
Nos. of Receiving station 1
Land on lease to erect sub-station at Karanj ( Varachha Road).
 
:: 1961 ::
Chairman Mr. A.N.Haksar
Consumers 1457 added - Total 30784
Units sold (In Lacs) 57.19 lac units
Maximum Demand 13200 kW
Profit (In Lacs) Rs.8.97 lacs
No. of Receiving station 2 nos.
“B” Receiving station was commissioned & connected to GEB Utran on February 28, 1961.
 
:: 1962 ::
Chairman Mr. A.N.Haksar
Consumers Added 1528 - Total 32312
Units sold (In Lacs) 58.42 lac units
Maximum Demand 13600 kW
Profit (In Lacs) Rs. 7.40 lacs
No. of Receiving station 2 nos.
 
:: 1963 ::
Chairman Mr. A.N.Haksar
Consumers Added 1754 -Total 34066
Units sold (In Lacs) 61.12 lac units
Maximum Demand 15850 kW
Profit (In Lacs) Rs. 9.02 lacs
No. of Receiving station 2 nos.
 
:: 1964 ::
Chairman Mr. A.N.Haksar
Consumers Added 2135- Total 36201
Units sold (In Lacs) 69.67 lac units
Maximum Demand 6700 kW
Profit (In Lacs) Rs. 11.12 lacs
No. of Receiving station 2 nos.
Land for ‘C’ Receiving Station purchased on September 29, 1964 vide Document No. 2377.
 
:: 1965 ::
Chairman Mr. A.N.Haksar
Consumers Added 2528 - total 38729
Units sold (In Lacs) 75.30 lac units
Maximum Demand 18900 kW
Profit (In Lacs) Rs.11.69 lacs
No. of Receiving station 2 nos.
 
:: 1966 ::
Chairman Mr. A.N.Haksar
Consumers Added 2522 - Total 41521
Units sold (In Lacs) 71.31 lac units
Maximum Demand 19700 kW
Profit (In Lacs) Rs. 16.17 lacs
No. of Receiving station 2 nos.
 
:: 1967 ::
Chairman Mr. A.N.Haksar
Consumers Added 3074 - Total 44595
Units sold (In Lacs) 87.28 lac units
Maximum Demand 21800 kW
Profit (In Lacs)  
No. of Receiving station 2 nos.
 
:: 1968 ::
Chairman Mr. R.P.Aiyer
Consumers Added 3063 - Total 47659
Units sold (In Lacs) 94.14 lac units
Maximum Demand 21700 kW
Profit (In Lacs) Rs.18.05 lacs
No. of Receiving station 3 nos.
Company started its own computerized billing.

French Garden bungalows purchased on December 03, 1968 vide Document No. 4841.

Station Road building started functioning from February / March’ 1968.

Vide Government Notification No. GU-29-LSX-3267-2232K dated April 08, 1968, Company’s status was changed from a ‘Licensee’ to ‘Sanction Holder’ for a period of 10 years up to April 12, 1978.

“C” Receiving Station commissioned and connected to GEB Grid.

:: 1969 ::
Chairman Mr. R.P.Aiyer
Consumers Added 3093- Total 50752
Units sold (In Lacs) 108.21 lac units
Maximum Demand 23800 kW
Profit (In Lacs) Rs.17.62 lacs
No. of Receiving station 3 nos.

 

:: 1970 ::
Chairman Mr. R.P.Aiyer
Consumers Added 3168- Total 53920
Units sold (In Lacs) 121.73 lac units
Maximum Demand 30000 kW
Profit (In Lacs) Rs.20.26 lacs
No. of Receiving station 3 nos.
Purchased French Garden Bungalow No. 2 on February 23, 1970 vide Document No. 761.

The Government abolished Managing Agency System.

Company started being managed by the Board of Directors from April 01, 1970.
 
:: 1971 ::
Chairman Mr. R.P.Aiyer
Consumers Added 3525 - Total 57445
Units sold (In Lacs) 137.25 lac units
Maximum Demand 32330 kW
Profit (In Lacs) Rs.21.01 lacs
No. of Receiving station 3 nos.
 
:: 1972 ::
Chairman Mr. R.P.Aiyer
Consumers Added 4368 -Total 61813
Units sold (In Lacs) 145.87 lac units
Maximum Demand 33440 kW
Profit (In Lacs) Rs. 21.36 lacs
No. of Receiving station 3 nos.
Started Contracts Division.

Registered Office shifted from Bombay to Surat.

 

:: 1973 ::
Chairman Mr. R.P.Aiyer
Consumers Added 5631 - Total 67444
Units sold (In Lacs) 162.39 lac units
Maximum Demand 35800 kW
Profit (In Lacs) Rs.28.08 lacs
No. of Receiving station 3 nos.
 
:: 1974 ::
Chairman Mr. R.P.Aiyer
Consumers Added 3595 - Total 71039
Units sold (In Lacs) 165.95 lac units
Maximum Demand 37690 kW
Profit (In Lacs) Rs. 21.71 lacs
No. of Receiving station 3 nos.
 
:: 1975 ::
Chairman Mr. R.P.Aiyer
Consumers Added 6734- Total 77096
Units sold (In Lacs) 186.75 lac units
Maximum Demand 44665 kW
Profit (In Lacs) Rs. 31.80 lacs
No. of Receiving station 3 nos.
‘Sanction’ extended vide Government Notification No. GU-75-15-LSX-3267-2232 from May 14, 1975 upto April 11, 1988
 
:: 1976 ::
Chairman Mr. R.P.Aiyer
Consumers Added 5769 -Total 82623
Units sold (In Lacs) 220.12 lac units
Maximum Demand 48435 kW
Profit (In Lacs) Rs. 51.59 lacs
No. of Receiving station 3 nos.
Generation discontinued.

Enhanced capacity of ‘B’ Receiving Station from 22kV to 66 kV.
 
:: 1977 ::
Chairman Mr. R.P.Aiyer
Consumers Added 6015 - Total 88473
Units sold (In Lacs) 250.12 lac units
Maximum Demand 55788 kW
Profit (In Lacs) Rs.47.08 lacs
No. of Receiving station 3 nos.
 
:: 1978 ::
Chairman Mr. R.P.Aiyer
Consumers Added 7608- Total 95771
Units sold (In Lacs) 284.38 lac units
Maximum Demand 62693 kW
Profit (In Lacs) Rs.19.44 lacs
No. of Receiving station 3 nos.
 
:: 1979 ::
Chairman Mr. R.P.Aiyer
Consumers Added 7289 - Total 102722
Units sold (In Lacs) 327.35 lac units
Maximum Demand 73010 kW
Profit (In Lacs) Rs. 46.04 lacs
No. of Receiving station 3
As per the Order of Government of Gujarat the Company started operations of generation & distribution of electricity at BET DWARKA in Saurashtra having 206 consumers & 18 streetlights.

Procured 9 plots of land on lease to develop electric sub-stations.

:: 1980 ::
Chairman Mr. B.C.Randeria
Consumers Added 6360 - Total 108230
Units sold (In Lacs) 353.9 lac units
Maximum Demand 77000 kW
Profit (In Lacs) Rs. 53.90 lacs
No. of Receiving station 3
Procured 6 plot of lands on lease to develop electrical sub-station.

:: 1981 ::
Chairman Mr. B.C.Randeria
Consumers Added 7735 -Total 115607
Units sold (In Lacs) 375.92 lac units
Maximum Demand 82928 kW
Profit (In Lacs) Rs.18.48 lacs
No. of Receiving station 3
Net Block (In Lacs) 1171 lacs
Dividend 4%
Registered office shifted to Surat.

Procured 05 plots of Land on lease for developing electric sub-stations.

‘Sanction’ of the Company extended up to April 11, 1988 vide Government Notification N GU-81-58-LSX-1180-9837-K.

:: 1982 ::
Chairman Mr. R.S.Bhatt
Consumers Added 7897 - total 123504
Units sold (In Lacs) 429.68 lac units
Maximum Demand 90298 kW
Profit (In Lacs) Rs. 107.53 lacs
No. of Receiving station 3
Net Block (In Lacs) 1323
Dividend 15%
Procured 07plots of Land on lease to develop electric sub-stations.

:: 1983 ::
Chairman Mr. R.S.Bhatt
Consumers Added 7500 - Total 131363
Units sold (In Lacs) 468.02 lac units
Maximum Demand 96270 kW
Profit (In Lacs) Rs.128.63 lacs
No. of Receiving station 3
Net Block (In Lacs) 1464
Dividend 16%
Procured 05 plots of Land on lease to develop electric sub-stations.

:: 1984 ::
Chairman Mr. R.S.Bhatt
Consumers Added 9422 - Total 140784
Units sold (In Lacs) 580.73 lac units
Maximum Demand 99190 kW
Profit (In Lacs) Rs.93.77 lacs
No. of Receiving station 3
Net Block (In Lacs) 1622
Dividend 16%
Procured 02 plots of Land on lease to develop electric sub-stations.

:: 1985 ::
Chairman Mr. R.S.Bhatt
Consumers Added 8740 - Total 149525
Units sold (In Lacs) 550.50 lac units
Maximum Demand 111935 kW
Profit (In Lacs) Rs. 117.37 lacs
No. of Receiving station 3
Net Block (In Lacs) 1825
Dividend 16%
Procured a plot of Land on lease to develop electric sub-station.

:: 1986 ::
Chairman Mr. R.S.Bhatt
Consumers Added 8907- Total 158431
Units sold (In Lacs) 583.83 lac units
Maximum Demand 110330 kW
Profit (In Lacs) Rs.128.18 lac
No. of Receiving station 3
Net Block (In Lacs) 2117
Dividend 16%
Procured a plot of land on lease for developing electric sub-station.

:: 1987 ::
Chairman Mr. R.S.Bhatt
Consumers Added 10115 - Total 168446
Units sold (In Lacs) 644.80 lac units
Maximum Demand 122525 kW
Profit (In Lacs) Rs.127.11 lacs
No. of Receiving station 3
Net Block (In Lacs) 2339
Dividend 16%
Procured a plot of land on lease for developing electric sub-station.

:: 1988 ::
Chairman Mr. R.S.Bhatt
Consumers Added 9192 - Total 177638
Units sold (In Lacs) 689.90 lac units
Maximum Demand 129035 kW
Profit (In Lacs) Rs.128.18 lacs
No. of Receiving station 3
Net Block (In Lacs) 2603
Dividend 16%

:: 1989 ::
Chairman Mr. R.S.Bhatt
Consumers Added 9623 - Total 187261
Units sold (In Lacs) 730.02 lac units
Maximum Demand 145010 kW
Profit (In Lacs) Rs.58.038 lacs
No. of Receiving station 3
Net Block (In Lacs) 3018
Dividend 16%
Purchased land for “E” Receiving Station on November 08, 1988.

In house computerization. Electricity bills also prepared inhouse

Formed Consultative Committee.

:: 1990 ::
Chairman Mr. R.S.Bhatt
Consumers Added 14303 - Total 201973
Units sold (In Lacs) 781.02 lac units
Maximum Demand 161728 kW
Profit (In Lacs) Rs.154.41 lacs
No. of Receiving station 4
Net Block (In Lacs) 3745
Dividend 18%
Commissioned “E” Receiving Station & connected to GEB Grid.

:: 1991 ::
Chairman Mr. R.S.Bhatt
Consumers Added 21114-Total 223087
Units sold (In Lacs) 856.47 lac units
Maximum Demand 167745 kW
Profit (In Lacs) Rs.101.00 lacs
No. of Receiving station 4
Net Block (In Lacs) 4558
Dividend 18%

:: 1992 ::
Chairman Mr. R.S.Bhatt
Consumers Added 19684 - total 242771
Units sold (In Lacs) Rs.929.95 lacs units
Maximum Demand 179810 kW
Profit (In Lacs) Rs. 34.29 lacs
No. of Receiving station 4
Net Block (In Lacs) 5404
Dividend 18%
 
:: 1993 ::
Chairman Mr. R.S.Bhatt
Consumers Added 14818 Total 257589
Units sold (In Lacs) 913.59 lac units
Maximum Demand 188250 kW
Profit (In Lacs) Rs.341.75 lacs
No. of Receiving station 5
Net Block (In Lacs) 6141
Dividend 22%
Commissioned “B2” Receiving Station and connected to GEB Grid.

Operations of Bet Dwarka handed over to Government.

:: 1994 ::
Chairman Mr. R.S.Bhatt
Consumers Added 18097 - Total 275686
Units sold (In Lacs) 1084.99 lac units
Maximum Demand 226021 kW
Profit (In Lacs) Rs.210.21 lacs
No. of Receiving station 6
Net Block (In Lacs) 7381
Dividend 22%
Nos. of Sub-Stations 598
On April 01, 1994 acquired land on lease for developing “G” Receiving Station.

Procured land on rent from SMC for developing “D2” Receiving Station.

Commissioned “G” Receiving Station & connected to GEB Grid.

:: 1995 ::
Chairman Mr. R.S.Bhatt
Consumers Added 13012 Total 288728
Units sold (In Lacs) 1152.82 lac units
Maximum Demand 240000 kW
Profit (In Lacs) Rs.116.07 lacs
No. of Receiving station 7
Net Block (In Lacs) Rs.8604 lacs
Dividend 22%
Nos. of Sub-Stations 654
Commissioned “D2” Receiving station and connected to GEB Grid.

:: 1996 ::
Chairman Mr. D.J.Patel
Consumers Added 18500 -Total 307228
Units sold (In Lacs) 1252.67 lac units
Maximum Demand 250000 kW
Profit (In Lacs) Rs. 374.23 lac
No. of Receiving station 7
Net Block (In Lacs) Rs.9749 lacs
Dividend 22%
Nos. of Sub-Stations 760
TORRENT Group acquired administrative control from November 14, 1996.

:: 1997 ::
Chairman Mr. D.J.Patel
Consumers Added 20616 - Total 327844
Units sold (In Lacs) 1370.00 lac units
Maximum Demand 274000 kW
Profit (In Lacs) Rs.537.06 lacs
No. of Receiving station 7
Net Block (In Lacs) Rs.11302 lacs
Dividend 22%
Nos. of Sub-Stations 828

:: 1998 ::
Chairman Mr. D.J.Patel
Consumers Added 18580 -Total 346424
Units sold (In Lacs) 148.68 lac units
Maximum Demand 288000 kW
Profit (In Lacs) Rs.919.00 lacs
No. of Receiving station 7
Net Block (In Lacs) Rs.12977 lacs
Dividend 30%
Nos. of Sub-Stations 916
Government extended ‘Sanction’ on July 02, 1977 for 30 years, up to April 11, 2028 vide Notification No. GU/97/49/LSX/896/K with conditions.

:: 1999 ::
Chairman Mr. D.J.Patel
Consumers Added 17622 -Total 364046
Units sold (In Lacs) 16436 lac units
Maximum Demand 358000 kW
Profit (In Lacs) Rs.930.00 lacs
No. of Receiving station 7
Net Block (In Lacs) Rs.16548
Dividend 30%
Nos. of Sub-Stations 1076
Procured land on lease from SMC for 99 years for “D” Receiving station.

:: 2000 ::
Chairman Mr. D.J.Patel
Consumers Added 16034 -Total 374528
Units sold (In Lacs) 17699 lac units
Maximum Demand 368000 kW
Profit (In Lacs) Rs.14.33 lacs
No. of Receiving station 8
Net Block (In Lacs) Rs.19062 lacs
Dividend 33%
Nos. of Sub-Stations 1179
Commissioned “D” Receiving Station & connected with GEB Grid.

:: 2001 ::
Chairman Mr. D.J.Patel
Consumers (In 000) 395
Units sold (In Lacs) 17540 lac units
Maximum Demand 395000 kW
Profit (In Lacs) Rs. 18.18 lacs
No. of Receiving station 9
Net Block (In Lacs) Rs.21801 lacs
Dividend 33%
Nos. of Sub-Stations 1311
Commissioned “F” Receiving Station & connected to GEB Grid.

:: 2002 ::
Chairman Mr. D.J.Patel
Consumers (In 000) 405
Units sold (In Lacs) 17870 lac units
Maximum Demand 409000 kW
Profit (In Lacs) Rs.16.26 lacs
No. of Receiving station 9
Net Block (In Lacs) Rs.22860 lacs
Dividend 33%
Nos. of Sub-Stations 1419
BONUS 1:1 declared .

:: 2003 ::
Chairman Mr. D.J.Patel
Consumers (In 000) 421
Units sold (In Lacs) 21950 lac units
Maximum Demand 475000 kW
Profit (In Lacs) Rs.23.87 lacs
No. of Receiving station 9
Net Block (In Lacs) Rs.26889 lacs
Dividend 33%
Nos. of Sub-Stations 1576
246 Acres land acquired for Generation Project at Akhakhol near Surat

5 acres land purchased for Water Intake Well near the Generation Site

Both the above lands acquired in the name of SEC

The Company has promoted a Special Purpose Vehicle, called ‘Torrent Power Generation Limited’ (TPGL) jointly with The Ahmedabad Electricity Company Limited and Torrent Private Limited for setting up 1000-1147.5 MW power generation

SEC entered into a long term Agreement with TPGLfor purchase of power

Land acquired on Lease from SMC for ‘F2’ Receiving Station

:: 2004 ::
Chairman Mr. Sudhir Mehta
Consumers (In 000) 456
Units sold (In Lacs) 22860 lac Units
Maximum Demand 496000 kW
Profit (In Lacs) Rs.3162
No. of Receiving station 10
Net Block (In Lacs) 31393
Dividend 33%
Nos. of Sub-Stations 1719
Commissioned ‘F2’ Receiving Station

Land acquired at Ashwini Kumar Road for new 66 kV ‘K’ Receiving Station

Land acquired on Lease from SMC for 220 kV ‘Bhatar’ Receiving Station

Land acquired on lease from SMC for 220 kV ‘Puna’ Receiving Station at Puna Kumbharia

:: 2005 ::
Chairman Mr. Sudhir Mehta
Consumers (In 000) 478
Units sold (In Lacs) 25350 lac Units
Maximum Demand 523000 kW
Profit (In Lacs) Rs.3996.47 lacs
No. of Receiving station 11
Net Block (In Lacs) 38643
Dividend 36%
Nos. of Sub-Stations 1875
Brand Migration – changed name of the Company from The Surat Electricity Co.Ltd. to Torrend Power SEC Limited

Commissioned ‘K’ Receiving Station at Ashwanikumar Road

Enhanced bill payment facility by introducing Mobile Van, Drop Boxes, E-Payment