| |
| |
|
Customers> Surat
City > General Information > Tariff |
 |
 |
|
RATE SCHEDULE - LOW /MEDIUM TENSION 230/ 400 Volts
Residential
Commercial
General
LTP
LTMD
Temporary Supplies
Agriculture
RATE SCHEDULE - FOR SERVICE AT HIGH TENSION
HTMD - 1
HTMD - 2
NTCT ( Night Time Concessional Rate
ADDITIONAL RATE/or CHARGES IN RESPECTIVE CATEGORY
|
Residential
This tariff shall be applicable to the services for the lights, fans, heating and small
electrical appliances such as refrigerators, cookers, heaters, water pump and small
motors having individual capacity not exceeding 2 BHP attached to domestic
appliances in residential premises.
a) Single phase supply
(aggregate load up to 6 KW)
b) Three phase supply
(aggregate load including motor load exceeding 6 KW)
FIX CHARGES ( Per Month) |
A |
Single Phase Supply |
Rs. 5.00 per installation |
B |
Three Phase Supply |
Rs.15.00 per installation |
PLUS : ENERGY CHARGES ( Per Month)
1 |
First 50 units |
270 Paise/ unit |
2 |
Next 50 units |
290 Paise/ unit |
3 |
Next 100 units |
335 Paise/ unit |
4 |
Next 50 units |
365 Paise/ unit |
5 |
Next 50 units |
395 Paise/ unit |
6 |
Above 300 units |
425 Paise/ unit |
|
Commercial
This tariff shall be applicable to services for lights, fans, heating and electrical
appliances such as refrigerators, cookers, heaters, HVAC and small motors having
individual capacity not exceeding 2 BHP attached to the appliances in Commercial
Premises which are not covered in Residential and General.
a) Single phase supply
(aggregate load up to 6 KW)
b) Three phase supply
(aggregate load including motor load exceeding 6 KW)
FIXED CHARGES: ( Per Month)
A |
Single Phase Supply |
Rs. 45.00 per installation |
B |
Three Phase Supply |
Rs. 75.00 per installation |
PLUS : ENERGY CHARGES: ( Per Month)
1 |
First 50 units |
330 Paise/ unit |
2 |
Next 50 units |
370 Paise/ unit |
3 |
Next 50 units |
410 Paise/ unit |
4 |
Next 350 units |
450 Paise/ unit |
5 |
Next 500 units |
475 Paise/ unit |
6 |
Above 1000 units |
490 Paise/ unit |
|
General
This tariff will be applicable for use of energy for lights, fans, heating, general load and motive power in premises:
- Crematoriums and Government and Municipal Hospitals.
- Charitable Institutions like hospital, dispensary, educational and Research Institute and Hostel attached to such Institution, religious premises exclusively used for worship or community prayers, registered with Charity Commissioner and specifically exempted from levy of general tax under section 2 (13) of Bombay
Trust Act, 1950 read with section 9 of The Income Tax Act, 1961.
- Public streets Lights, gardens and conveniences.
- Water works and sewerage pumping services operated by Municipal Corporations.
Note: Halls or gardens or any portion of the above premises let out for consideration or used for commercial activities at any time shall be charged at Commercial tariff.
a) Single phase supply
(aggregate load up to 6 KW)
b) Three phase supply
(aggregate load including motor load exceeding 6 KW)
| Fixed Charges |
Rs. 20.00 per installation per month |
Plus
| Energy Charges |
315 Paise/ unit |
|
LTP
This tariff is applicable for aggregate contracted motive power load not exceeding 50 BHP.
FIXED CHARGES: ( Per Month)
A |
First 10 BHP |
Rs. 20/-Per BHP |
B |
Next 10 BHP |
Rs. 30/-Per BHP |
C |
Above 20 BHP |
Rs. 35/-Per BHP |
PLUS : ENERGY CHARGES: ( Per Month)
1 |
Up to 10 BHP |
330 Paise/ unit |
2 |
10.1 - 15 BHP |
350 Paise/ unit |
3 |
Above 15 BHP |
375 Paise/ unit |
MINIMUM BILL
per installation per month (excluding meter charges):
| For the Contracted load |
Rs 100/-per BHP per month |
Note:
- The minimum charges specified above should be payable only if fixed charges and Energy Charges fall short by minimum billed amount.
- The consumers having aggregate contracted load above 20 KVA can opt for Rate LTMD. The option to switch over from Rate LTP to Rate LTMD and vice versa can be exercised twice in a calendar year by giving one-month notice in writing.
|
LTMD
This tariff shall be optionally available to consumers using electricity for motive power services with contracted load up to 50 HP and having minimum contract demand of 20 KVA and compulsory for contracted load above 50 HP to 125 HP
- The option can be exercised to switchover from LTMD to LTP and vice versa twice in a calendar year by giving not less than 30 days notice in writing for connected load up to 50HP.
- For the optional LTMD tariff consumers has to provide metering system in the event when proper metering is not provided by the Company.
DEMAND CHARGES: ( Per Month)
A |
Up to 50 KVA of billing demand |
Rs. 50/-per KVA |
B |
Above 50 KVA & up to 60 KVA of billing demand |
Rs. 60/-per KVA |
C |
Above 60 KVA of billing demand. |
Rs. 70/-per KVA |
D |
In excess of contract demand |
Rs. 180/-per KVA |
Note:
BILLING DEMAND: -Billing demand during the month shall be the highest of the following:
a) Maximum demand recorded during the month.
b) 85 % of the contract demand.
c) 20 KVA
Plus
| Energy charges |
385 Paise/ unit |
Plus
REACTIVE ENERGY CHARGES (KVARH units): For installation having contracted load of 50 HP and above
| For all the reactive units drawn during the month |
10 Paise/ kVArh |
|
TS-Temporary Supplies:
| Energy Charges |
470 Paise/ unit |
|
Agriculture
This tariff is applicable to motive power services used for irrigation purpose. The rates for following group are as under
| Fixed Charges |
Rs. 10.00 per BHP per month |
PLUS :
| Energy Charges |
50 Paise/ unit |
Note:
The agricultural consumers shall be permitted to utilize one bulb up to 40 watts in the Pump House without recovering any charges. Any further extension or addition of load will amount to unauthorized extension.
No machinery other than pump for irrigation will be permitted under this tariff |
HTMD - 1
This tariff shall be applicable for supply of energy at 3.3KV and above for industrial purpose, water works, pumping and similar activities and contracting for demand of 100 KVA or more.
DEMAND CHARGES: For billing demand up to contract demand
A |
First 500 KVA of billing demand |
Rs. 80/-per KVA per month |
B |
Next 500 KVA of billing demand |
Rs. 110/-per KVA per month |
C |
Above 1000 KVA of billing demand |
Rs 125/-per KVA per month |
For billing demand in excess of contract demand
| For Billing demand in excess over Contract demand |
Rs. 335/-per
KVA per month |
Note:
BILLING DEMAND: Billing demand shall be the highest of the following: -
a. Actual maximum demand established during the month
b. 85 per cent of the Contract Demand, and
c. 100 KVA
PLUS : ENERGY CHARGES: ( Per Month)
1 |
Up to 1000 KVA |
380 Paise/ unit |
2 |
Above 1000 KVA |
390 Paise/ unit |
PLUS : TIME OF USE CHARGES: ( Per Month)
(These charges shall be levied from a consumer having Contract Demand or actual demand of 500 KVA and above)
| For energy consumption during the two peak
periods, viz 0700 Hrs to 1100 Hrs and 1800
Hrs to 2200 Hrs |
70 paise
per unit |
PLUS : Power Factor Adjustment Charges
- The power factor adjustment charges shall be levied at the rate of 1% on the total amount of electricity bills for the month under the head "Demand Charges" and "Energy Charges " for every 1% drop or part thereof in the average power factor during the month below 90% up to 85 %.
- In addition to the above clause, for every 1% drop or part thereof in average power factor during the month below 85% at the rate of 2% on the total amount of electricity bill for that month under the head "Demand Charges" and "Energy Charges ", will be charged.
Power Factor Adjustment Rebate: -
If the average power factor of the consumer's installation in any month is 95%, the consumer will be entitled to a rebate at the rate of 1% in excess of 95% power factor on the total amount of electricity bill for that month under the head "Demand Charges" and "Energy Charges ", for every 1% rise or part thereof in the average power factor during the month above 95%.
LIGHTING AND NON-INDUSTRIAL LOADS:
The consumption of lights and fans and other non-industrial loads of the factory building as also the consumption of creche, laboratory, stores, timekeeper's Office, yards, watch and ward, first aid centers, and dispensaries during a month registered at the main meter on HT side shall be charged at the energy charges specified above.
NIGHT TIME CONCESSION:
The energy consumed during night hours between 22. 00 hours and 06. 00 hours next day (recorded by the tariff meter operated through time switch or built in feature of time segments, if incorporated) as is in excess of one third of total energy consumed during the month, shall be eligible for concession of 50 Paise per KWH. The meter and time switch shall be procured and installed by consumer at his cost, if required by the Company. The Company, if provided by consumer, will seal the metering equipment.
REBATE FOR SUPPLY AT EHV:
| Sr.No. |
On Energy Charges: |
Rebate @ |
| (a) |
If supply is availed at 33/ 66 KV |
0.5 % |
| (b) |
If supply is availed at 132 KV and above |
1.0 % |
|
HTMD - 2
This tariff shall be applicable for supply of energy to consumers at 3.3 KV and above for contracting the demand of 100 KVA and above and requiring power for:
- Hospitals, Hotels, Military Installations, Studios, Aerodrome, Cinema, Auditorium.
- Bank Offices, Educational Institutions, Film Production, Railways and such other establishments where load is of non-industrial nature.
- Purposes not covered under the tariff HTMD-1.
DEMAND CHARGES: For billing demand up to contract demand
A |
First 500 KVA |
Rs 100/-per KVA |
B |
Above 500 KVA |
Rs 130/-per KVA |
For billing demand in excess over contract demand
| For billing demand in excess over contract demand |
Rs. 360/-per KVA |
Note: BILLING DEMAND: Billing demand shall be the highest of the following: -
a. Actual maximum demand established during the month
b. 85 per cent of the Contract Demand, and
c. 100 KVA
PLUS : ENERGY CHARGES:
1 |
Up to 500 KVA |
395 Paise/ unit |
2 |
Above 500 KVA |
400 Paise/ unit |
PLUS : TIME OF USE CHARGE:
(These charges shall be levied from a consumer having contract demand or actual demand of 500 KVA and above)
| For energy consumption during the two peak
periods, viz, 0700 Hrs to 1100 Hrs and 1800 Hrs to 2200 Hrs. |
70 paise
per unit |
PLUS : Power Factor Adjustment Charges
- The power factor adjustment charges shall be levied at the rate of 1% on the total amount of electricity bills for the month under the head "Demand Charges" and "Energy Charges " for every 1% drop or part thereof in the average power factor during the month below 90% up to 85 %.
- In addition to the above clause, for every 1% drop or part thereof in average power factor during the month below 85% at the rate of 2% on the total amount of electricity bill for that month under the head "Demand Charges" and "Energy Charges ", will be charged.
Power Factor Adjustment Rebate:
If the average power factor of the consumer's installation in any month is 95%, the consumer will be entitled to a rebate at the rate of 1% in excess of 95% power factor on the total amount of electricity bill for that month under the head "Demand Charges" and "Energy Charges ", for every 1% rise or part thereof in the average power factor during the month above 95%.
REBATE FOR SUPPLY AT EHV:
| Sr.No. |
On Energy Charges: |
Rebate @ |
| (a) |
If supply is availed at 33/ 66 KV |
0.5 % |
| (b) |
If supply is availed at 132 KV and above |
1.0 % |
|
NTCT ( Night Time Concessional Tariff)
This is nighttime concessional tariff for consumers for regular power supply who opt to use electricity EXCLUSIVELY during night hours between 22.00 hours and 06.00 hours next day. The consumer shall provide the switching arrangement as shall be acceptable to the Company to regulate supply hours.
| a) Fixed Charges: |
30 % of the fixed/ demand charge (Under the relevant tariff) |
PLUS |
| b) Energy Charge: |
310 Paise per KWH |
|
ADDITIONAL RATE/or CHARGES
In addition to rates and/ or charges specified hereinbefore, the consumer shall pay charges/ adjustments as stated in the respective category and described below:
- FUEL PRICE AND POWER PURCHASE ADJUSTMENT CHARGES (FPPPA): shall be applicable as approved by the Gujarat Electricity Regulatory Commission from time to time.
- METER CHARGES.
- DELAY PAYMENT CHARGES
3.1. No delay payment charges will be levied if the bill is paid on
or before due date indicated in the bill.
3.2. Delay payment charges, if the bill is paid after due date, will
be
levied at the rate of 0.5% per week or part thereof on
the outstanding bill from the date of billing till the date of
payment.
- STATUTORY LEVIES:
These tariffs are exclusive of Electricity Duty, Tax on Sales of Electricity, Taxes and other Charges levied/ may be levied or such other taxes as may be levied by the Government or other Competent Authorities on bulk/ retail supplies from time to time.
|
| |
|
| Quick
Links |
|
|
| |
| SUGEN 1147.5 MW CCPP |
| The
SUGEN 1147.5 MW CCPP is a backward integration more...
|
|
| News
& Events |
|
| |
 |
Shut down announcements for maintenance at Torrent Power more...
|
| |
|