Tariff Categories (for low and medium voltage connections)

RGP (Residential General Purpose)
Applicable to lights, fans and domestic appliances for heating, cooling, cleaning and refrigeration in residential premises.

GLP (General Lighting Purpose)
Applicable to lights, fans and domestic appliances for heating, cooling, cleaning and refrigeration purposes in premises other than residential like public hospitals, dispensaries, educational and research institutions, religious premises etc. Such premises should be in use of 'public trust' as defined under section 2(13) of the Bombay Public Trust Act 1950.

IGP (Industrial General Purpose)
Applicable to lights, fans and domestic appliances for heating, cooling, cleaning and refrigeration purposes in industrial premises including office premises attached to factories provided that the rating of individual appliances does not exceed 2 kW.

CGP (Commercial General Purpose)
Applicable to lights, fans and domestic appliances for heating, cooling, cleaning and refrigeration purposes in premises other than residential, those covered by the rate GLP and the rate IGP, provided that the rating of individual appliances does not exceed 2 kW.

LTP 1 (Low Tension Power)
Applicable to motive power installations upto and including 15 BHP of connected load used for residential purpose and pumping stations run by local authorities.

LTP 2 (Low Tension Power)
Applicable to motive power installation upto and including 15 BHP of connected load excluding installations for agricultural purpose and those covered under LTP1 category.

LTMD 1 (Low Tension Maximum Demand)
Applicable to motive power installations above 15 BHP of connected load used for residential purpose and pumping stations run by local authorities.

LTMD 2 (Low Tension Maximum Demand)
Applicable to motive power installations above 15 BHP of connected load excluding installations for agricultural purpose and those covered under LTP1 category.

HTMD
Applicable for supply of energy to High Tension consumers contracting for maximum demand of 100 KW and above. (Other than pumping stations run by local authorities)

HT PUMPING STATIONS
Applicable for supply of energy to water and sewage pumping stations run by local authorities and contracting for maximum demand of 100 KW and above.

Tariff Plans
Electricity tariffs are determined by GERC from time to time. Broadly the tariffs are categorised under various tariff plans applicable as per your purpose and connected loads.

1. LT Tariffs for Lighting

Tariff Plan (Monthly Units)
Rate
(Paise per unit)
Fixed Charges
(Rs. per month)
.
First 50 units
Next 150 units
Remaining Units
Single Phase

Three Phase

RGP
270
310
395
5.00
15.00
GLP
320
320
390
10.00
30.00
CGP
360
395
490
30.00
75.00
IGP
360
395
490
30.00
75.00

2. LT Tariffs for Motive Power

Tariff Plan (Monthly Units)
Rate
(Paise per unit)
Fixed Charge Per BHP per Month (Rs.)
.
 
Upto 5 BHP

5 Upto 15 BHP

LTP1
342
17.00
17.00
LTP2
350
20.00
25.00


3. LTMD

Tariff Plan
Rate
(Paise per
unit per KW)
Fixed Charge Per BHP
per Month (Rs.)
.
Billing
Demand
Billing Demand upto
& Including Contract Demand

Billing Demand in excess of Contract Demand

-
Upto 50KW
Above 50KW
First 50KW
Next 30KW Remanining
-
LTMD1
350
365
70.00
90.00 120.00
325.00
LTMD2
365
385
80.00
110.00- 150.00
350.00

4. HTMD & HT (Pumping Station)

Tariff Plan

Unit charges (Paise per unit )

Fixed Charge (Rs. Per KW)

up to 400 units per KW

Remaining units

Billing Demand upto   and   including Contract Demand

Billing Demand    in excess   Contract Demand

HTMD

339

331

140

275

HT
(Pumping Station)

310

140

275


TOU Charges:

Category

Billing Demand

Paise per unit

HTMD

up to 300 KW

50

above 300 KW

70

HT ( Pumping station )

 

50



Power Factor Adjustment Charges for LTMD, HTMD and HT
(Pumping station)


1. Average Power Factor>90%
Paise per unit
(a) 90-95%
Rebate of 0.15 paise for
each 1 % improvement
(b) >95% Rebate of 0.27 paise for
each 1 % improvement
   
2. Average Power Factor<90% Penalty of 3.00 paise for each 1 % decrease

5. Temporary Supply

Tariff Plan
Rate (Paise per unit)
Fixed Charge per kW per day (Rs.)
TS
390
14.00

 
  Quick Links
Redressal Forum
Safety Tips
Report Theft
Energy Conservation
Electricity Supply Code
 
  SUGEN 1147.5 MW CCPP